How does design approval work?
No structure or improvement may be built or changed until the Design Review Board approves it. That includes later work such as painting, renovations, and landscaping. Send one digital file, or two copies, of the required documents to info@theparc.live. Each document should include the project name, The Parc lot number, the owner name or names, and the date. The Design Approval Process PDF describes the steps: review the lot purchase agreement, plat, Design Code, Declaration of Covenants, and the procedure itself; submit Concept Review (Form A, schematic drawings, a site plan, floor plans, elevations, any variance, and an architectural type); then submit Construction Documents before construction begins. The Board notifies the owner in writing within 30 days of receiving an application. Board approval does not replace governmental permits.